20. If the minister having authority over a part of the lands in the domain of the State is unable, within 30 days before the beginning of work that must be undertaken in that part of those lands to carry out an infrastructure project listed in Schedule I, to grant the rights necessary to carry out that work, the minister may temporarily allow the work to be carried out, on the conditions the minister determines, until the minister grants the necessary rights, provided the work is not incompatible with a right previously granted on that part of those lands or with any other related constraint.
This section does not have the effect of relieving anyone from the obligation to obtain the rights necessary to carry out a project.
2020, c. 272020, c. 27, s. 20.