51. The authorization referred to in sections 47, 48 and 49 is withdrawn if the project which is the object of the authorization is not begun within one year after the authorization is given or if the project is interrupted for more than one year.
If a project is interrupted, the withdrawal of the authorization does not prevent the Minister from obtaining an order under section 195.