(1) require that any person discharging waste water or substances into purification works comply with all or part of the following conditions:(a) the construction of a man-hole in conformity with the requirements prescribed by the Community, to allow the inspection, sampling, measuring and registration of the quality and flow of the discharged waste water or substances;
(b) the installation and maintenance in good repair of appropriate equipment for the sampling, analysis, measuring and registration of the quality and flow of the discharged waste water or substances, in accordance with the methods prescribed by the Community;
(c) the installation and maintenance in good repair of equipment for the treatment or pre-treatment of waste water or of substances to be discharged in order to regularize the flow of discharge or to bring the equipment into conformity with the requirements of a by-law under section 159.7;
(d) the presentation, for approval, of the plans relating to the installation of the equipment referred to in subparagraph a,b or c, and the procedures for the use of such equipment;
(e) the discharged waste water or substances must not exceed an average or maximum concentration or mass of discharged pollutants according to the class of pollutants;
(f) the presentation of periodic discharge reports indicating the volume and the qualitative and quantitative characteristics of the discharged waste water or substances;
(2) determine the schedule of execution of work required(a) for the issue, renewal or retention of a permit; or
(b) for the prevention or cessation of an offence or a nuisance.