17. Upon completion of the construction work and before permitting the operation of the works, the proposing party shall transmit to the Minister a declaration by the engineer in charge of the work to the effect that he is satisfied that the construction work has been carried out in accordance with recognized engineering standards, the terms and conditions of the Minister’s approval or, where no approval is required, the construction standards prescribed by regulation.
1988, c. 57, s. 17; 1997, c. 78, s. 1.