Q-2 - Environment Quality Act

Full text
SCHEDULE A

(Sections 153, 188, 205)
PROJECTS AUTOMATICALLY SUBJECT TO THE ASSESSMENT AND REVIEW PROCEDURE

The projects listed below are automatically subject to the assessment and review procedure contemplated in sections 153 to 167 and 187 to 204:
(a) all mining developments, including the additions to, alterations or modifications of existing mining developments;
(b) all borrow, sand and gravel pits and quarries, with areas of or over 3 hectares;
(c) all hydro-electric power plants and nuclear installations and their associated works;
(d) all storage and water supply reservoirs related to works intended to produce electricity;
(e) all electric power transmission lines of over 75 kV;
(f) all operations or installations related to the extraction or processing of energy yielding materials;
(g) all fossil-fuel fired power generating plants with a calorific capacity of or above 3,000 KW;
(h) any road or branch of such road of at least 25 km in length which is intended for forestry operations for a period of at least 15 years;
(i) all wood, pulp and paper mills or other plants for the transformation or the treatment of forest products;
(j) all land use projects which affect more than 65 km2;
(k) all sanitary sewage systems including more than 1 km of piping and all waste water treatment plants designed to treat more than 200 kl of waste water per day;
(l) all systems for the collection and disposal of residual materials, except mine tailings and hazardous materials;
(m) all projects for the creation of parks or ecological reserves;
(n) all outfitting facilities designed to accommodate at one time 30 persons or more, including networks of outpost camps;
(o) the delimitation of the territory of any new community or municipality and any expansion of 20% or more of their total territory or their urbanized areas;
(p) all access roads to a locality or road network contemplated for a new development;
(q) all port and harbour facilities, railroads, airports, pipelines or dredging operations for the improvement of navigation.
The projects listed in this Schedule do not include the activities contemplated in paragraph g of Schedule B.
Notwithstanding paragraph a, mining exploration projects are not automatically subject to the assessment and review procedure contemplated in sections 153 to 167.
1978, c. 94, s. 6; 1996, c. 2, s. 840; 1999, c. 75, s. 36.
SCHEDULE A

(Sections 153, 188, 205)
PROJECTS AUTOMATICALLY SUBJECT TO THE ASSESSMENT AND REVIEW PROCEDURE

The projects listed below are automatically subject to the assessment and review procedure contemplated in sections 153 to 167 and 187 to 204:
(a) all mining developments, including the additions to, alterations or modifications of existing mining developments;
(b) all borrow, sand and gravel pits and quarries, with areas of or over 3 hectares;
(c) all hydro-electric power plants and nuclear installations and their associated works;
(d) all storage and water supply reservoirs related to works intended to produce electricity;
(e) all electric power transmission lines of over 75 kV;
(f) all operations or installations related to the extraction or processing of energy yielding materials;
(g) all fossil-fuel fired power generating plants with a calorific capacity of or above 3 000 KW;
(h) any road or branch of such road of at least 25 km in length which is intended for forestry operations for a period of at least 15 years;
(i) all wood, pulp and paper mills or other plants for the transformation or the treatment of forest products;
(j) all land use projects which affect more than 65 km2;
(k) all sanitary sewage systems including more than 1 km of piping and all waste water treatment plants designed to treat more than 200 kl of waste water per day;
(l) all systems for the collection and disposal of solid waste;
(m) all projects for the creation of parks or ecological reserves;
(n) all outfitting facilities designed to accommodate at one time 30 persons or more, including networks of outpost camps;
(o) the delimitation of the territory of any new community or municipality and any expansion of 20 % or more of their total territory or their urbanised areas;
(p) all access roads to a locality or road network contemplated for a new development;
(q) all port and harbour facilities, railroads, airports, pipelines or dredging operations for the improvement of navigation.
The projects listed in this Schedule do not include the activities contemplated in paragraph g of Schedule B.
Notwithstanding paragraph a, mining exploration projects are not automatically subject to the assessment and review procedure contemplated in sections 153 to 167.
1978, c. 94, s. 6; 1996, c. 2, s. 840.
SCHEDULE A

(Sections 153, 188, 205)
PROJECTS AUTOMATICALLY SUBJECT TO THE ASSESSMENT AND REVIEW PROCEDURE

The projects listed below are automatically subject to the assessment and review procedure contemplated in sections 153 to 167 and 187 to 204:
(a) all mining developments, including the additions to, alterations or modifications of existing mining developments;
(b) all borrow, sand and gravel pits and quarries, with areas of or over 3 hectares;
(c) all hydro-electric power plants and nuclear installations and their associated works;
(d) all storage and water supply reservoirs related to works intended to produce electricity;
(e) all electric power transmission lines of over 75 kV;
(f) all operations or installations related to the extraction or processing of energy yielding materials;
(g) all fossil-fuel fired power generating plants with a calorific capacity of or above 3 000 KW;
(h) any road or branch of such road of at least 25 km in length which is intended for forestry operations for a period of at least 15 years;
(i) all wood, pulp and paper mills or other plants for the transformation or the treatment of forest products;
(j) all land use projects which affect more than 65 km2;
(k) all sanitary sewage systems including more than 1 km of piping and all waste water treatment plants designed to treat more than 200 kl of waste water per day;
(l) all systems for the collection and disposal of solid waste;
(m) all projects for the creation of parks or ecological reserves;
(n) all outfitting facilities designed to accommodate at one time 30 persons or more, including networks of outpost camps;
(o) any new city, community or municipality and any expansion of 20% or more of their total territory or their urbanised areas;
(p) all access roads to a locality or road network contemplated for a new development;
(q) all port and harbour facilities, railroads, airports, pipelines or dredging operations for the improvement of navigation.
The projects listed in this Schedule do not include the activities contemplated in paragraph g of Schedule B.
Notwithstanding paragraph a, mining exploration projects are not automatically subject to the assessment and review procedure contemplated in sections 153 to 167.
1978, c. 94, s. 6.