38. The emergency action plan must be reviewed(1) when a dam safety review is conducted;
(2) prior to authorization for the permanent or temporary stopping of the operation of the dam; and
(3) prior to authorization for the structural alteration of the dam or for a change in use likely to affect its safety, if carrying out the project for which authorization is sought would enlarge the area that would be affected by a dam failure.