Q-2, r. 6 - Groundwater Catchment Regulation

Full text
SCHEDULE I
(s. 20)
DRILLING REPORT
The following information must be entered in the drilling report:
(1) name of the owner of the site on which the catchment work is installed;
(2) address of the site on which the catchment work is installed (number, street, municipality, postal code);
(3) cadastral description of the lot on which the catchment work is installed;
(4) location of the catchment work:
— No. of topographical map at a scale of 1:50 000;
— latitude - longitude coordinates or UTM coordinates: X and Y;
— UTM zone;
— projection system used: NAD 27 or NAD 83;
(5) sketch indicating location and distance from
— soil absorption system;
— road;
— dwelling;
— building;
(6) units of measure used to complete the report;
(7) intended use of the water drawn;
(8) projected maximum daily volume;
(9) number of water drilling permit (WDP);
number of licence issued by the Régie du bâtiment du Québec;
date of installation of catchment work;
(10) drilling method:
— rotary;
— cable tool;
— diamond;
— excavation;
— earth auger;
— driven wells;
(11) description of drilling:
— drilled depth;
— drilled diameter;
(12) casing length and diameter;
length rising above the ground;
type of well liner;
(13) length, diameter, opening and type of strainer, where applicable;
(14) length, diameter and type of exterior liner or cribbing, if any;
(15) nature and thickness of the geological formations encountered;
(16) flow rate test:
— date of the test;
— water level before pumping (static level) and at the end of pumping (dynamic level);
— duration of pumping;
— flow rate of the catchment work;
— pumping method.
O.C. 696-2002, Sch. I.