3.1. Every operator of a transfer station referred to in the second paragraph of section 2 must also pay the charges prescribed by the first paragraph of section 3 for each metric ton of residual materials transferred and intended for a disposal facility.
1458-2022O.C. 1458-2022, s. 31.