63. Receiving waste: Every incinerator must be provided with a pit or a waste receiving area located inside a building and kept under negative pressure.
A waste pit is obligatory for incinerators with a capacity of more than 50 metric tons per day.
All receiving areas for waste must be cleaned up at the end of each day’s operations.
R.R.Q., 1981, c. Q-2, r. 14, s. 63; O.C. 585-92, s. 4.