(1) where it is located on land,(a) $10,000,000 for a pipeline whose design capacity is less than 5,000 barrels per day;
(b) $25,000,000 for a pipeline whose design capacity is between 5,000 and 14,999 barrels per day;
(c) $50,000,000 for a pipeline whose design capacity is between 15,000 and 29,999 barrels per day;
(d) $200,000,000 for a pipeline whose design capacity is between 30,000 and 49,999 barrels per day;
(e) $300,000,000 for a pipeline whose design capacity is between 50,000 and 250,000 barrels per day; and
(f) $1,000,000,000 for a pipeline whose design capacity is greater than 250,000 barrels per day; and
(2) where it is located in a body of water,(a) $25,000,000 for a pipeline whose design capacity is less than 5,000 barrels per day;
(b) $40,000,000 for a pipeline whose design capacity is between 5,000 and 14,999 barrels per day;
(c) $75,000,000 for a pipeline whose design capacity is between 15,000 and 29,999 barrels per day;
(d) $200,000,000 for a pipeline whose design capacity is between 30,000 and 49,999 barrels per day;
(e) $300,000,000 for a pipeline whose design capacity is between 50,000 and 250,000 barrels per day; and
(f) $1,000,000,000 for a pipeline whose design capacity is greater than 250,000 barrels per day or where it is located in a lake whose area is greater than 1,000 km2 or in a marine environment.