74. The authorization holder must ensure that the measurements of the stratigraphic survey path deviation are taken at intervals that allow the position of the wellbore to be determined accurately and that do not exceed 150 m, unless there is a wellbore stability problem.
1251-2018O.C. 1251-2018, s. 74.