Classes of projects for rate class purposesRate classes
1234
PROJECTS LISTED IN SCHEDULE A TO THE ACT
Paragraph (a)
All mining developments, including additions to, alterations or
modifications of existing mining developments:
 
- New project, alterations   X
- Additions  X 
Paragraph (b)
All borrow, sand and gravel pits and quarries, with areas of or over 3 hectares
X   
Paragraph (c)
All hydro-electric power plants and nuclear installations and their associated works
   X
Paragraph (d)
All storage and water supply reservoirs related to works intended to produce electricity
X   
Paragraph (e)
All electric power transmission lines of over 75 kV
   X
Paragraph (f)
All operations or installations related to the extraction or processing of energy yielding materials
  X 
Paragraph (g)
All fossil-fuel fired power generating plants with a calorific capacity of or above 3,000 kW;
  X 
Paragraph (h)
Any road or branch of such road of at least 25 km in length which is intended for forestry operations for a period of at least 15 years
   X
Paragraph (i)
All wood, pulp and paper mills or other plants for the transformation or the treatment of forest products
  X 
Paragraph (j)
All land use projects which affect more than 65 km2
  X 
Paragraph (k)
All sanitary sewage systems including more than 1 km of piping and all waste water treatment plants designed to treat more than 200 kl of waste water per day
 X  
Paragraph (l)
All systems for the collection and disposal of residual materials, except mine tailings and hazardous materials
 X  
Paragraph (m)
All projects for the creation of parks or ecological reserves
  X 
Paragraph (n)
All outfitting facilities designed to accommodate at one time 30 persons or more, including networks of outpost camps
X   
Paragraph (o)
The delimitation of the territory of any new community or municipality and any expansion of 20% or more of their total territory or their urbanized areas
 X  
Paragraph (p)
All access roads to a locality or road network contemplated for a new development
   X
Paragraph (q)
All port and harbour facilities, railroads, airports, pipelines, or dredging operations for the improvement of navigation:
    
- work related to a harbour facility X  
- construction of a railroad   X
- siting of an airport X  
- construction of a pipeline   X
- dredging operations for the improvement of navigationX   
M.O. 2016, s. 28.