74. The operator must continuously measure and record the pH and temperature at the points referred to in the first paragraph of section 62, on each day on which there is a discharge. The operator must also continuously measure and record the pH at the point referred to in the second paragraph of section 62 if the operator wishes to take advantage of the second paragraph of section 12.