76. In addition to the components listed in sections 72 and 73, the external inspection of a pressure vessel subject to a corrosion rate control must include(1) the verification of the surface of at least one exposed part of the vessel’s coating; and
(2) the determination of the thickness of the walls and comparison with the results obtained at the time of previous external inspections.