21. Only the buildings and equipment used exclusively to harvest or process sap may be constructed or installed.
In addition, their use must not go beyond what is necessary for the harvest or transformation of sap.
When the permit expires, or if it is cancelled, the buildings and the equipment must be removed.
2018-006M.O. 2018-006, s. 21.