M-11.6, r. 2 - Regulation respecting the rate to determine the costs of sampling, analysis, inspection or investigation included in the costs of civil or penal proceedings instituted for the purposes of the Act respecting certain measures enabling the enforcement of environmental and dam safety legislation

Texte complet
À jour au 1er janvier 2016
Ce document a valeur officielle.
chapter Q-2, r. 47
Regulation respecting the rate to determine the costs of sampling, analysis, inspection or investigation included in the costs of civil or penal proceedings instituted for the purposes of the Environment Quality Act
Environment Quality Act
(chapter Q-2, s. 116.1.1).
The rates prescribed in the Regulation have been indexed as of 1 January 2016 pursuant to the notice published in Part 1 (French) of the Gazette officielle du Québec of 19 December 2015, page 1280. (s. 3, Sch. I)
1. The costs incurred by the Minister of Sustainable Development, Environment and Parks includes the costs related to the use of the personnel and equipment of the Ministère du Développement durable, de l’Environnement et des Parcs and, if any, the costs related to the use of external human or material resources.
M.O. 2005-10-11, s. 1.
2. The rate for departmental labour and special equipment is established in Schedule I.
M.O. 2005-10-11, s. 2.
3. Despite section 2, the rate for a laboratory analysis made by the Department is established on the basis of the time required for the analysis at an hourly rate of $118.57, including manpower and equipment.
M.O. 2005-10-11, s. 3.
4. The rate for external human and material resources corresponds to the actual costs incurred by the Minister.
M.O. 2005-10-11, s. 4.
5. The costs established in section 3 and in Schedule I to this Regulation are adjusted on 1 January of each year based on the percentage change in the Consumer Price Indexes for Canada, as published by Statistics Canada; the change is calculated by determining the difference between the average of the monthly indexes for the 12-month period ending on 30 September of the preceding year and the average of the monthly indexes for the equivalent period of the second preceding year.
The Minister is to publish the results of the adjustment in the Gazette officielle du Québec before 1 January of each year and, if the Minister considers it appropriate, by any other means.
M.O. 2005-10-11, s. 5.
6. (Omitted).
M.O. 2005-10-11, s. 6.
SCHEDULE I
(ss. 2 and 5)
RATE FOR THE RESOURCES OF THE MINISTÈRE DU DÉVELOPPEMENT DURABLE, DE L’ENVIRONNEMENT ET DES PARCS
___________________________________________________________

ITEMS COSTS
___________________________________________________________

Labour $ / hour
$ / quarter of an hour
___________________________________________________________

Public servant - technician $47.42*
$11.86*
___________________________________________________________

Professional or engineer $71.16*
$17.79*
___________________________________________________________

Executive $88.93
$22.22
___________________________________________________________

Special equipment $ / day or part of day
of use
___________________________________________________________

Nitrites and nitrates analyzer $948.63
___________________________________________________________

Flame thermocouple detector $35.56
___________________________________________________________

Photo-ionization detector $41.50
___________________________________________________________

Gas detector $23.71
___________________________________________________________

Automatic sampler $118.57
___________________________________________________________

Flow measurement equipment $231.24
___________________________________________________________

Gas-powered portable drill $237.15
___________________________________________________________

Generator $160.08
___________________________________________________________

Mobile laboratory - LEAE $1,482.24
(environmental analysis)
___________________________________________________________

Mobile laboratory - LMP (multi-purpose) $2,561.81
___________________________________________________________

Mobile laboratory - TAGA $11,146.51
(trace atmospheric gas analyzer)
___________________________________________________________

Water pump $160.08
___________________________________________________________

Air sampler pump $166.02
___________________________________________________________

Electric peristaltic pump $237.15
___________________________________________________________

Submersible pump $444.66
___________________________________________________________

Waterra pump $213.45
___________________________________________________________

Mobile coordination unit $1,345.87
___________________________________________________________

Seismograph $634.41
___________________________________________________________

Water level sensors $17.79
___________________________________________________________

Interface sensors $17.79
___________________________________________________________

Type I sonometer $53.35
___________________________________________________________

Type II sonometer $17.79
___________________________________________________________

Blower $23.71
___________________________________________________________

Portable radioactivity spectrometer $432.83
___________________________________________________________

Water oxidation evaluation station $41.50
___________________________________________________________

Total survey station (including software) $41.50
___________________________________________________________

Meteorological tower $314.24
___________________________________________________________

Safety harness, lifeline and tripod $77.08
___________________________________________________________

Radioactivity measurement kit $509.88
___________________________________________________________

Turbidimeter $59.30
___________________________________________________________

Mobile sampling unit $398.28
___________________________________________________________
* Under the collective agreements in force, the tariff is increased by 50% if a member of the personnel of the Ministère du Développement durable, de l’Environnement et des Parcs works in excess of normal weekly working hours.
M.O. 2005-10-11, Sch. I.
REFERENCES
M.O. 2005-10-11, 2005 G.O. 2, 4693