(1) require that any person discharging waste water or substances into a purification works comply with all or any of the following conditions:(a) the construction of a man-hole in conformity with the requirements prescribed by the city, to allow the inspection, sampling, measuring and registration of the quality and flow of the discharged waste water and substances;
(b) the installation and maintenance in good repair of appropriate equipment for the sampling, analysis, measuring and registration of the quality and flow of the discharged water or substances, in accordance with the methods prescribed by the city;
(c) the installation and maintenance in good repair of equipment for the treatment or pre-treatment of waste water or substances to be discharged in order to regularize the flow of the discharged waste water or substances or to bring the equipment into conformity with the prescriptions of a by-law passed under subparagraphs 7 to 12 of the first paragraph of section 60;
(d) the presentation, for approval, of the plans relating to the installation of the equipment referred to in subparagraph a, b or c, and the procedures for the use of such equipment;
(e) the maintenance of the discharged waste water and substances within an average or maximum concentration or mass of discharged pollutants according to the class of pollutants;
(f) the presentation of periodic discharge reports indicating the volume and the qualitative and quantitative characteristics of the discharged waste water and substances;
(2) determine the schedule of execution of the work required(a) for the issue, renewal or maintenance of a permit;
(b) for the prevention or cessation of an offence or a nuisance.