148.0.17. If the work is not completed within the time set, the council may have it carried out and recover the costs of the work from the owner. The costs constitute a prior claim on the land where the immovable was situated, of the same nature and with the same rank as the claims described in paragraph 5 of article 2651 of the Civil Code; the costs are secured by a legal hypothec on the land.