209. Where it is foreseen that activities on a construction site will occupy at least 10 construction workers simultaneously at a stage of the work, at least one health and safety representative must be designated, as soon as work begins, by a majority of the construction workers present on the construction site.
Failing that, the representative association with the most affiliated construction workers present on the construction site shall designate the health and safety representative.
1979, c. 63, s. 209; 2021, c. 272021, c. 27, s. 2261.