161.4. The strategic plan must state(1) the mission of the Commission ;
(2) the context in which the Commission acts and the main challenges it faces ;
(3) the strategic directions, objectives and lines of intervention selected ;
(4) the results targeted over the period covered by the plan ;
(5) the performance indicators to be used in measuring results.