55. The strategic plan must include(1) the mission of the Commission;
(2) the context in which the Commission acts and the main challenges it faces;
(3) the strategic directions, objectives and lines of action selected;
(4) the results targeted over the period covered by the plan; and
(5) the performance indicators to be used in measuring results.