283. In the event of suspension of work in a mine for a month or more, the operator must forward to the Minister within a delay of two months a certified copy of the plans of the underground workings, of the surface installations and deposits of tailings existing at the date of cessation of work.
1965 (1st sess.), c. 34, s. 254.