M-13.1 - Mining Act

Full text
232.7.1. The rehabilitation and restoration work must begin, in respect of each of the activities covered by the plan, at the time specified by the plan or, failing that,
(1)  within three years after a cessation of the mining operations; or
(2)  on the cessation of activities in other cases.
However, the Minister may require that the work begin earlier, or authorize one or more extensions of the time limit. The first extension shall not exceed three years and any additional extension shall not exceed one year.
2013, c. 32, s. 91; 2024, c. 36, s. 91.
232.7.1. Rehabilitation and restoration work must begin within three years after operations cease. However, the Minister may exceptionally require that the work begin within a shorter period, or authorize one or more extensions. The first extension may not exceed three years and additional extensions may not exceed one year.
2013, c. 32, s. 91.