(2) B is an amount equal to,(a) if the operator does not engage in smelting, refining or hydrometallurgy, 10% of the capital cost to the operator of the particular property,
(b) if the operator engages in smelting, refining or hydrometallurgy exclusively outside Québec,i. 10% of the capital cost of the particular property where the property is used solely in processing ore from a gold or silver mine, or
ii. the amount by which 13% of the capital cost of the particular property, where the property is used in processing ore other than ore from a gold or silver mine, exceeds 3% of the proportion of the capital cost of the particular property, where it is used for concentration purposes, that the quantity of ore concentrated by the operator, which is not smelted or refined by the operator, or is not the subject of hydrometallurgy activity carried on by the operator, and the processing of which required the use of the particular property, is of the total quantity of ore the processing of which required the use of the particular property, or
(c) if the operator engages in smelting, refining or hydrometallurgy in Québec,i. 10% of the capital cost of the particular property where the property is used solely in processing ore from a gold or silver mine, or
ii. the amount by which 20% of the capital cost of the particular property, where the property is used in processing ore other than ore from a gold or silver mine, exceeds the aggregate of 7% of the proportion of the capital cost of the particular property that the quantity of ore that is smelted or refined by the operator outside Québec, or is the subject of hydrometallurgy activity carried on by the operator outside Québec, and the processing of which required the use of the particular property, is of the total quantity of ore the processing of which required the use of the particular property, and 10% of the proportion of the capital cost of the particular property, where it is used for concentration purposes, that the quantity of ore concentrated by the operator, which is not smelted or refined by the operator, or is not the subject of hydrometallurgy activity carried on by the operator, and the processing of which required the use of the particular property, is of the total quantity of ore the processing of which required the use of the particular property.