17.5. The total of the financial participation and surety bonds provided by the local municipality in respect of a given enterprise referred to in section 17.1 may not exceed the amount required to set up electricity production equipment with a generating capacity of 50 megawatts and incidental storage equipment.
2006, c. 31, s. 118; 2021, c. 312021, c. 31, s. 1001.