120. The Board may require an electricity, gas or petroleum product distribution undertaking to obtain its authorization before supplying an electrical installation, an installation intended to use gas or a petroleum equipment installation.
1985, c. 34, s. 120; 1991, c. 74, s. 168; 1991, c. 74, s. 52; 2005, c. 10, s. 51.