75. Every newly listed dam or dam newly classified as a high-capacity dam with characteristics that do not comply with the minimum safety standards applicable to it pursuant to Division II of Chapter III must be brought into conformity with those standards not later than the earlier of(1) the date on which the dam undergoes a structural alteration that affects all parts of the dam or that, because of the scope of the work, is equivalent to reconstructing the dam; and
(2) in the case of a dam whose failure consequence category is equal to or greater than “moderate”, or in the case of an associated dam, the completion date stated in the outline of remedial measures and implementation schedule approved by the Minister under section 17 of the Act.
In addition, if structural alterations other than those referred to in subparagraph 1 of the first paragraph are made to a dam whose failure consequence category is equal to or greater than “moderate” or to an associated dam before either of those dates, the dam must be brought into conformity with the various minimum safety standards applicable to the work, to the parts of the dam or to the characteristics of the dam being altered or affected by the alterations to the structure of the dam.
O.C. 300-2002, s. 75; O.C. 17-2005, s. 15; 989-2023O.C. 989-2023, s. 521.