22. A groundwater withdrawal facility used to supply water for human consumption must be designed with materials suitable for drinking water supply systems.
It must be cleaned and disinfected before being operated to eliminate any possibility of water contamination. The same applies to any accessory equipment installed more than 2 days after the cleaning and disinfection of the water withdrawal facility.