15. Unless a groundwater withdrawal facility is intended to replace an existing facility used for the same purpose, the groundwater withdrawal facility may not be installed in a floodplain having a flood recurrence interval of 20 years, or in the identified floodplain of a lake or watercourse unless the 20-year and 100-year flood recurrence intervals have been distinguished.