In force: 2018-09-20
22. The holder of an exploration or production licence or an authorization to produce brine may not, in the territory of any urbanization perimeter delimited in a land use and development plan made under the Act respecting land use planning and development (chapter A-19.1) and at less than 1,000 m from the latter, conduct geophysical surveying or geochemical surveying, drill a stratigraphic survey and drill, re-enter and complete a well in the ground. The holder of a storage licence may not, in such a territory and at less than 1,000 m from the territory, conduct geophysical surveying or geochemical surveying, drill a stratigraphic survey and a well, and fracture a well in the ground.
1252-2018O.C. 1252-2018, s. 22.