212. The authorization holder must immediately notify the Minister where any of the following incidents occurs:(1) the maximum pressure provided for in the technical program is exceeded;
(2) the volume of fluid rising to the surface exceeds the volume anticipated;
(3) the holder has reasons to suspect a flaw in the casing or the casing cement, or the absence of isolation of a source of usable groundwater aquifer.