The daily report must contain all the elements applicable to the declared day including, in particular,(1) the completion authorization number;
(2) a description, in chronological order, of the work carried out and the time required to carry out each step of the work;
(3) the name of the enterprises that carry out the completion work;
(4) a summary of the meteorological conditions;
(5) the result of all the pressure and leak tests, including their duration and the initial and final test pressures;
(6) the working condition of the blowout prevention system;
(7) the well logs carried out;
(8) the type of packers installed and the installation depths;
(9) the technical details of the perforations, in particular, the number, type and intervals;
(10) if applicable, the technical details of the completion by chemical stimulation, if applicable, in particular, the intervals, concentrations and volumes of acids and additives injected, the volume of flow-back water and the flows, and the injection pressures;
(11) the composition, concentration and detailed assessment of all the products identified in the technical program that are stored or used on the activity site;
(12) the number, interval, volume of fluid, injection rate and pressure and a summary of the results of each injectivity test;
(13) the volume and composition of the gas used, released, incinerated or burnt at the flare;
(14) the operational problems encountered and the corrective measures taken or planned;
(15) the indication of any event that disrupted the planned progress of the work;
(16) the indication of any temporary work interruption and the procedure followed to secure the well; and
(17) any other information or document deemed necessary by the Minister.