274.The authorization holder must place a mechanical packer in the internal casing at 150 m under the bottom of the water and a cement plug must fill those 150 m.
274.The authorization holder must place a mechanical packer in the internal casing at 150 m under the bottom of the water and a cement plug must fill those 150 m.