214. An exploration licence holder who carries out tests must ensure that(1) the equipment used is designed so as to properly evaluate the formation;
(2) the equipment rated pressure upstream of and including the well testing manifold exceeds the maximum anticipated shut-in pressure; and
(3) the equipment downstream of the well testing manifold is sufficiently protected against overpressure.