41. The authorization holder must, within 12 months after the granting of the authorization by the Minister, start the geophysical surveying work.
The work is deemed to have started as soon as the first step provided in the work schedule is initiated.
The Minister may grant an additional time period if the holder demonstrates the need therefor.
1251-2018O.C. 1251-2018, s. 41.