3.9.12. Inspection: Scaffoldings shall be inspected by a qualified person:(a) at least once every 3 months;
(b) following any failure of the material;
(c) after any abnormal pressure or any incident which might have adversely affected the structure; and
(d) when re-used after any lengthy work interruption.