S-2.1, r. 4 - Safety Code for the construction industry

Full text
3.23.15.1. On a construction site where moderate-risk work is being carried out, workers must, before removing their protective clothing and other individual protective equipment, decontaminate them using a wet cloth or a vacuum cleaner equipped with a high-efficiency filter.
O.C. 645-2022, s. 8.