S-2.1, r. 4 - Safety Code for the construction industry

Full text
SCHEDULE 6
(s. 3.24.18)
The right beam-column supporting bracket will have its upper part notched as illustrated to clear the 1st bolt already in place to support the beam previously installed.
R.R.Q., 1981, c. S-2.1, r. 6, Sch. 6; O.C. 391-2011, s. 3.