S-2.1, r. 4 - Safety Code for the construction industry

Full text
SCHEDULE 2.6
(s. 4.7.5)
Evaluation of the maximum authorized particle speed, of the distance between blasting and buildings or of the acceptable frequency of vibrations
O.C. 57-2015, s. 62.