7. Bridge: Any bridge on a forestry road shall:(a) be constructed according to a plan approved by an engineer who is a regular member of the Ordre des ingénieurs du Québec;
(b) have a posted capacity near the road at 30 m from both ends of the bridge;
(c) be equipped on each side of the deck with a longitudinal piece at least 200 mm in height and firmly fixed to this deck; and
(d) be inspected and well maintained during operations.