302. After a rope is installed and cut and before operation of the hoist is resumed, the following standards shall be respected:(1) 2 complete descending and rising cycles shall be performed with an empty conveyance;
(2) the tightening torque of the clamps and the absence of slipping in the attachment shall be checked;
(3) 2 complete descending and rising cycles shall be performed while the conveyance is carrying its maximum load of materials; before those 2 cycles are carried out, the use of the hoist to lower a conveyance tender is authorized;
(4) the checks prescribed in paragraph 2 shall be carried out a second time.