256. Except during the operation to align a hoist with the floor of a shaft station:(1) the devices installed in the shaft stations for starting up a hoist shall be designed so that they can be operated only when the gate of the shaft is closed at the level where the conveyance is stopped;
(2) there shall be a minimal delay of 5 seconds between the operation of any shaft station device to initiate hoist motion and the actual motion.