70.18. The promoter must, before submitting a project report to the Minister in accordance with section 70.14, correct any error, omission or inaccuracy identified during the verification, if correction is possible.
O.C. 1184-2012, s. 45; 1125-2017O.C. 1125-2017, s. 491.