35. To ensure monitoring of the project, the promoter must establish a project monitoring plan, which must(1) specify the methods used to collect and record the data required for all the monitoring parameters in Appendix C, and specify the frequency of data acquisition; and
(2) specify the role of the person responsible for each monitoring activity and the quality assurance and quality control measures taken to ensure that data acquisition, and the verification of measurement instrument accuracy and calibration are carried out consistently, precisely and in accordance with the conditions set out in this Chapter.