20. Subject to the second paragraph, if there is excavation, on-site soil must be reused in accordance with the Soil Protection and Contaminated Sites Rehabilitation Policy, published by Les Publications du Québec and accessible on the website of the Ministère du Développement durable, de l’Environnement, de la Faune et des Parcs.
Bedding and surround soil for water mains must be clean. The covering of the clean soil over a main must be at least 30 cm deep.
Surplus excavated materials must be treated, reclaimed or disposed of in compliance with the Act.
O.C. 635-2008, s. 20; O.C. 653-2013, s. 7.