8. A storage and handling centre for road salt and abrasives must be sited(1) 60 m or more from a watercourse or lake and 30 m or more from wetlands;
(2) outside a flood zone;
(3) 15 m or more from a septic tank other than a septic tank located on the site;
(4) 30 m or more from all vegetation used as a wind or noise shield; and
(5) 100 m or more from a category 1, 2 or 3 groundwater withdrawal site.