73.1. Modification of a building or site: The construction of an additional bedroom, the increase of the operating or utilization capacity of a building or site, or the change of use of a building do not prevent the construction or maintenance of a privy or a compost toilet paired with a seepage pit provided that the standards of this Regulation are met.
306-2017O.C. 306-2017, s. 461.