37. Construction standards: An above-ground sand-filter bed built with a gravity feed system must comply with the construction standards in subparagraphs d, e, f, g, g.1, g.2, g.3, h and h.1 of the first paragraph of section 21, and with the following standards:(a) the sand layer must be at least 30 cm thick and must be thoroughly settled by water spraying before installation of the pipes;
(b) the sand filter must comply with the following:i. the effective diameter must be between 0.25 and 1 mm;
ii. the uniformity coefficient must be equal to or less than 4.5;
iii. less than 3% of the particles must have a diameter less than 80 µm; and
iv. less than 20% of the particles must have a diameter greater than 2.5 mm;
(c) subparagraphs a and c of the first paragraph of section 27 apply, with the necessary modifications, to an above-ground sand-filter bed;
(d) the maximum width of a sand-filter bed or of a section of a sand-filter bed must comply with the standards in the following table, according to the permeability of the disposal site:
___________________________________________________
Permeability of the Maximum width of the
disposal site sand-filter bed (metres)
___________________________________________________
High permeability soil 3.1
___________________________________________________
Permeable soil 1.9
___________________________________________________
Low permeability soil 1.3
___________________________________________________
(e) a line of perforated pipes must be not longer than 18 m measured from the point of entry;
(f) when the sand-filter bed is built on level ground, the grade of the earth backfill on each side of the sand-filter bed must be not more than 33%;
(g) when the sand-filter bed is built on sloped ground, the grade of the earth backfill on each side of the sand-filter bed must be not more than 33%, except on the front side of the slope where it must be not more than 25% with backfill at least 6 m long;
(h) before building the sand-filter bed, the soil on which it is built must be tilled;
(i) the bottom of the gravel or crushed stone layer must be at least 90 cm above bedrock or the layer of impermeable soil.The above-ground sand-filter bed built with a low pressure feed system must comply with subparagraphs a, b, c, d and f to i of the first paragraph of this section, subparagraphs d, e, f, g, g.1, and g.2 of the first paragraph of section 21 and subparagraphs a and b of the second paragraph of that section.