324.1. The construction of an aerial linear infrastructure used for the transportation or distribution of electric power or telecommunications is exempted from an authorization under this Division, on the following conditions:(1) the encroachment on the ground of the structures does not exceed the areas referred to in the first paragraph of section 324;
(2) no tree clearing is carried out in the littoral zone or a riverbank or lakeshore, except if(a) it is necessary to cross a lake or watercourse;
(b) it makes it possible to connect the infrastructure to an existing infrastructure in the littoral zone, the riverbank or lakeshore or less than 5 m from the riverbank or lakeshore if that infrastructure skirts a lake or watercourse; or
(c) it is carried out in the right of way of an existing road in the littoral zone, the riverbank or lakeshore or less than 5 m from the riverbank or lakeshore if that road skirts a lake or watercourse;
(3) any tree clearing required by the work does not exceed 250 m in wetlands and bodies of water.
Despite the first paragraph, the dismantling of an infrastructure referred to therein is exempted without conditions.
1461-2022O.C. 1461-2022, s. 511.