203. In addition to the general content prescribed by section 16, every application for authorization for an activity referred to in section 202 must include a technical report signed by an engineer, showing that the device has the capacity to treat the wastewater flows and loads on the basis of the receiving environment and uses.
871-2020O.C. 871-2020, s. 203.